login: password:
 
Boris Szlanko
city: SW19 6SS London
trades: Building   Wet Room Installation   
date add: 2017-08-18
 
Enter project description
tiling in the kitchen, before:-)
tiling in the kitchen, before:-)
and after:-) simple tiling to show you how would it look like before and after:-)
and after:-) simple tiling to show you how would it look like before and after:-)
this was kitchen fitting, whole kitchen with tiling...job was to remove old kitchen units, and assemble flat pack kitchen
this was kitchen fitting, whole kitchen with tiling...job was to remove old kitchen units, and assemble flat pack kitchen
kitchen in Brixton, durning the fitting project
kitchen in Brixton, durning the fitting project
shower
shower


Discount units